current projects

Construction of sewer transmission line in Robat Karim (under the Vahn Abad main road and railway)by micro tunneling method

.Client : Tehran Province Water and Wastewater Co

:Commencement date 

:Completion date 

Brief description of the project:Construction of sewer transmission line of concrete pipe 1800 mm diameter as casing pipe and PE pipe  1200 and 1400 mm diameter as main pipe ,**** meter long, in 9 until 16 meter depth by microtunneling method with MTBM  2200

 

Construction of sewer network and transmission line in Rooh Abad,Part 3, by micro tunneling and open trench  methods in Zarang-Kerman

.Client : Iranian Industrial Development and Renovation Construction Mana Co

:Commencement date 

:Completion date 

Brief description of the project:Construction of sewer network of HDPE pipe,diameter  200 until 300 mm,24000 meter long, 2meter to 7 meter depth by open trench method and transmission line of ductile iron pipe 450 mm diameter,6000 meter long and transmission line of HDPE pipe 850 and 1000 mm diameter,7000 meter long in 7 until 10 meter depth by microtunneling method ,temporary  casing,with auger boring machine